Property
Herron Site
Peel Region, Western Australia. Industrial land zoned Rural developed to support energy generation and commercial activities, with existing buildings, hardstand areas and supporting infrastructure.
3.4 Ha
Site area
Herron
Locality
Peel
Region
SWIS
Market region
Site overview
Industrial Renewable Energy Footprint
The MHPS property comprises approximately 3.4 hectares of industrial land located at Herron in the Peel region of Western Australia. The site has been developed to support energy generation activities and includes existing buildings, hardstand areas and supporting infrastructure.
Located in the South Peel area....
Key physical features
Land, buildings and operational areas
Land & layout
- · Total area: approximately 3.4 hectares
- · Cleared and developed industrial energy site (approx 2ha cleared)
- · Suitable for ongoing energy operations
- · Existing access
Buildings & structures
- · Shed / workshop facilities — practical covered space for maintenance, storage and operations support
- · Associated hardstand and working areas
- · Supporting infrastructure for plant and equipment
Hardstand & operations
- · Established hardstand suitable for containerised BESS deployment, fuel storage and equipment placement
- · Practical layout supporting staged development while retaining existing generation assets
Photography
Site gallery
Buildings, access and on-site electrical infrastructure.
Location advantages
Peel region · SWIS · Western Power connection
- Situated within the South West Interconnected System (SWIS)
- Existing Western Power network connection already established on site
- Rural Peel region location offering practical operational advantages for energy infrastructure
- Proximity to established logistics and service networks in the broader Perth–Peel corridor
Open in Google Maps · Herron, Peel region, WA
Sale basis
The property and associated plant & equipment are offered for sale on an as-is, where-is basis. Prospective purchasers will have the opportunity to conduct full due diligence, including site inspection, under appropriate confidentiality arrangements.
Next steps
Energy facility & development path